Don't worry about what to do when the cement floor

2022-07-22
  • Detail

With the progress of modern times and society, many people may feel that the cement floor is not beautiful, and the color and foot feel are relatively cold and hard. In fact, the finished cement floor, which is self leveling, can be coated to produce various effects, which is very beautiful. Now let's introduce the construction process of cement floor and how to deal with the wet cement floor

with the progress of modern times and society, many people may feel that the cement floor is not beautiful, and the color and foot feel are relatively cold and hard. In fact, the finished cement floor, which is self leveling, can be coated to produce various effects, which is very beautiful. Now let's introduce the construction process of cement floor and how to deal with the wet cement floor

I. construction process of cement floor

1.20 thick 1:2 cement mortar compaction and troweling cement mortar floor quota

2 Sprinkle plain cement surface (sprinkle an appropriate amount of clean water)

3.20 thick 1:4 hard cement mortar bonding layer leveling layer quota sub item

4.20 thick 1:3 cement mortar leveling layer quota sub item

5.80 thick C15 concrete with troweling concrete cushion

II. Reasons for moisture return

there are two reasons for moisture return on the ground floor of the residence: first, humid air with high temperature (relative humidity above 90%), In case of low temperature and smooth non absorbent ground, condensate should be formed on the ground surface (generally when the temperature is about 2 ℃), which mostly occurs in the plum rain season with plenty of rain, high temperature and high humidity. Once the weather turns sunny and dry, the phenomenon of moisture return can be eliminated; Second, the water in the foundation soil under the ground cushion rises through the action of capillaries, and the gaseous water penetrates upward, which makes the ground materials moist, and then worsens the humidity of the whole room. This kind of situation often occurs all year round, which is difficult to deal with. There are also poor drainage around the outdoor, poor ventilation of the room, etc., which will cause large-area back humidity. When building materials with poor compactness are used as indoor floors, capillary action will be increased, making the phenomenon of ground moisture return more serious

III. inspection and treatment of wet ground

1 Inspection: first, check whether there are cracks on the ground. Cracks are the main channel for upward seepage of groundwater. Generally, cracks with a width of more than 0.05 mm on the cement mortar or cast-in-place concrete floor are visible cracks. Regular cracks usually appear along the longitudinal or transverse direction of the room, and are formed by material shrinkage and cracking. Then check whether there is hollowing on the ground. You can use a wooden stick to tap gently and vertically along the ground. If the knocking sound is empty, there is an empty drum

2. Cracks: treatment of hollowing. For regular cracks, chisel ’ V’ Shape joints. After cleaning the joints, seal them with asphalt ointment. If you can bake with flame, the crack will be fully dried, and the effect will be better. Generally, hair cracks are closed in a large area. Where there is hollowing, the surface course shall be knocked off, the cushion shall be roughened, a layer of cement slurry shall be brushed on the cushion, and then the same material as the surface course shall be used for repair and leveling

3. Moisture proof treatment: after partial treatment of cracks and hollows, the surface course shall be comprehensively moisture-proof and sealed. The principle of treatment is to block the capillary water seepage channel in cement mortar or concrete. Generally, the method of brushing waterproof paint or waterproof agent can be adopted. Before painting, the surface course shall be roughened, cleaned, and painted with two layers of waterproof paint. Force shall be applied during the first painting to make it go deep into the capillary hole. After the first coating is dry (usually about 24 hours), the second coating is applied, so as to form an overall waterproof coating. At the corner of the ground and the wall, the paint should be painted to the height of the wall skirting board

make a new surface course after moisture-proof treatment of the original ground. The selection of new surface course materials should consider the selection of ground materials with high strength, wear resistance, certain moisture-proof ability, easy to clean, practical and beautiful. Cement mortar surface course can also be used. As for air humidity, in addition to special needs, equipment can be used to control humidity. In general, buildings should not open windward windows and less windward doors to reduce the influx of moist air into the room