The latest schedule for the rectification of produ

2022-09-23
  • Detail

The latest schedule of production restriction, shutdown, shutdown and remediation of chemical enterprises

the latest schedule of production restriction, shutdown, shutdown and remediation of chemical enterprises

June 8, 2018

[China paint information] a few days ago, the Ministry of ecological environment disclosed the rectification and implementation of the central environmental protection inspectors in Beijing, Shanghai, Hubei, Guangdong, Chongqing, Shaanxi and Gansu. Through supervision and rectification, a number of long-term difficult environmental problems have been solved

from May 9 to the end of June, 150 inspection teams composed of experts from national environmental law enforcement and solid waste management departments went to 11 provinces in the Yangtze River economic belt to conduct on-site inspection and supervision on more than 1400 solid waste storage sites

it involves 11 provinces along the Yangtze River economic belt, including Shanghai, Jiangsu, Zhejiang, Jiangxi, Chongqing and Sichuan. The chemical industry has been a key industry in VOCs Pollution Prevention in recent years. This year, many provinces and cities across the country have issued arrangements for the production suspension and restriction time of the chemical industry, and the requirements of chemical parks will be further improved

rectification tasks have been completed by more than 70%

as of the end of April 2018, 357 of the 493 rectification tasks specified in the rectification plan of the central environmental protection inspectors in Beijing, Shanghai, Hubei, Guangdong, Chongqing, Shaanxi and Gansu have been completed, with a task completion rate of more than 70%, and the rest are in progress

among them, Chongqing has strengthened the ecological protection of the Yangtze River, formulated a negative list of industrial access to key ecological functional areas, banned new heavy chemical projects within 1 km of the coastline of the Yangtze River trunk line and major tributaries, no new industrial parks within 5 km, and promoted the remediation and relocation of enterprises with potential environmental risks along the river

the key parts of the experimental machine should often be filled with lubricating grease

a small amount of rectification tasks lag behind

"the rectification work of 7 provincial (municipal) supervisors has achieved phased results, but there are still some weak links." The relevant person in charge of the State Environmental Protection Supervision Office said

first, the progress of a small number of rectification tasks has lagged behind

the progress of dismantling and shutting down illegal projects such as wind power and coal mines in some nature reserves lags behind, and the rectification tasks such as pollution control infrastructure construction, tailings pond treatment and ecological environment restoration in some areas do not meet the requirements of chronological progress

second, the rectification efforts in some regions still need to be strengthened

some regional river basin environmental improvement, industrial and energy structure adjustment, illegal project cleaning and other rectification tasks have entered the critical stage, the rectification difficulty has increased, the work intensity has weakened, and the improvement effect of environmental quality in some regions is not ideal, even showing a deterioration trend

third, some people reported environmental problems and rebounded

some places failed to draw inferences from one instance and conduct comprehensive investigation in the process of supervision and rectification, resulting in new technologies always being described as "revolutionary", and some environmental problems of the same type still exist. In some places, due to the delay in tracking and asking for results, some people's complaints have not been truly rectified and implemented, resulting in repeated complaints

the second round of central environmental protection supervision will begin next year. The Ministry of ecological environment will continue to promote the work of environmental protection supervision, organize and carry out the first round of supervision "looking back", start the second round of central environmental protection supervision from 2019, and include relevant departments and state-owned enterprises into the scope of supervision for overall arrangement; At the same time, for some key areas of the pollution prevention and control battle, we will carry out mobile and point special inspections, go straight to the problem, be seriously accountable, and strengthen deterrence. We will actively develop the legal system for supervision

on the basis of summarizing the first round of supervision work, promote the construction of supervision laws and regulations, bring environmental protection supervision into the track of legalization and standardization, and consolidate the legal foundation of supervision. Constantly study and improve the supervision system. Cooperate with relevant departments to promote the construction of supervision system, improve the central and provincial environmental protection supervision system, and gradually cultivate and form a professional supervision team in practice

launch remediation schedules in many places

Guangdong

investigate and find out "scattered and polluted" industrial enterprises, and implement classified remediation

time:

troubleshooting stage (May 10, 2018 June 30)

cleaning and remediation stage (July 1, 2018 September 30, 2019)

summary and review stage (October 1, 2019 December 31, 2019)

Hubei

the province continues to resolutely shut down and dismantle enterprises that do not meet environmental protection requirements

in 2018, the first batch of provincial environmental protection supervision work was fully launched, and four provincial environmental protection supervision teams have been established to carry out environmental protection supervision work in four cities (prefectures) including Huangshi City, Shiyan City, Xianning City and Enshi Prefecture

Shaanxi

according to the requirements of the three-year action plan (year) of Shaanxi iron fist to control haze and win the blue sky defense war recently issued, the central Shaanxi region implements the wrong time production (10:: sets of colors and 00 stops production) for the surface coating (including auto repair) and packaging and printing industries in summer (June 1 to August 31). Guanzhong cities can formulate more stringent peak staggering production requirements in combination with local actual conditions

Henan

in the "2018 green upgrading operation plan for industrial enterprises" recently released by Henan Province, from October 1, 2018, it is required to complete the transformation of special emission limits for key enterprises, involving inorganic chemistry and how to judge the quality of an electronic tensile testing machine, synthetic resin, caustic soda, PVC, nitric acid and sulfuric acid industries. Raise the environmental protection access threshold for VOCs related industries, and new industrial enterprises related to VOCs emissions should enter the park. Implement the equivalent or multiple reduction and substitution of VOCs emissions in the region, and implement the substitution scheme into the enterprise emission permit, which should be included in the environmental law enforcement management

Langfang

it is understood that from May 1 to September, all major VOC (volatile organic compounds) emission enterprises in Langfang, Hebei Province have been required to stop production or limit production if they fail to meet the relevant national, provincial and municipal emission requirements

the scope covers the city's pharmaceutical, pesticide, rubber products, coatings and other chemical industries, as well as automobile, wood furniture, engineering machinery and other industries with industrial coating

Tangshan

carried out the investigation and rectification of "scattered pollution" enterprises and strengthened the tough action

tough action date: May 10 to June 30, 2018

"scattered pollution" enterprises refer to enterprises that do not conform to industrial policies, do not conform to the local industrial layout planning, and do not go through the relevant approval procedures such as hairdressing reform, industry and information technology, land, environmental protection, industry and commerce, safety supervision, water affairs, electricity, and cannot stably meet the discharge standards

Chengdu

from November 2018 to February 2019, key enterprises (except those included in the list of ultra-low emission enterprises) that emit nitrogen oxides (NOx), sulfur dioxide (SO2), smoke, dust and volatile organic compounds (VOCs) will implement production restriction and shutdown. In addition, the four provincial environmental protection supervision teams in Sichuan Province have all completed the entry of inspectors

Copyright © 2011 JIN SHI